EKA Synergy Projects

Industrial Solar System in Bangalore

Scalable, Safe, and Cost-Saving Solar for Factories and Plants

Looking to cut electricity costs and increase energy independence for your factory or manufacturing unit? A professionally engineered industrial solar system can deliver long-term savings while supporting your sustainability goals. At Eka Synergy Projects, we specialize in designing and installing high-capacity solar power for industries in Bangalore — tailored to your load profile, roof structure, and operational hours.

Why Choose Solar for Industrial Use in Bangalore?

Z

Reduce High Electricity Bills

 Our systems help offset peak-hour power usage and reduce your EB expenses by up to 80%.

Z

Improve Power Stability

Designed to handle large load surges and protect equipment with proper grounding and protections.

Z

Match Your Operational Load

Solar generation aligns with your machine operating hours for maximum efficiency.

Z

Support ESG & Compliance Goals

Ideal for factories pursuing energy certification, CSR alignment, or green manufacturing.

Z

Faster ROI for Industries

A typical solar system for industries recovers cost in 3–4.5 years, with savings for 20+ years.

Types of Industrial Solar Systems

We offer system options based on load behavior and backup needs:

On-Grid Industrial Solar Power

On-Grid Industrial Solar Power System

Most common for industries — connects to the BESCOM grid with net feed-in. High savings, simple design, and fast ROI.

Hybrid Industrial Solar Energy Systems

Hybrid Industrial Solar Energy System

Adds battery backup for select loads. Ideal if your industry needs power even during grid failures.

Off-Grid Solar PV System (Selective)

Off-Grid Solar PV System (Selective Use)

Used only in remote industrial locations without grid access. Designed with sufficient battery capacity to run critical operations.

Cost & ROI for Factory Solar System in Bangalore

A properly designed factory solar system in Bangalore offers strong financial returns with minimal operating costs.

Cost per kW

₹48,000 to ₹60,000

Common system sizes

3 to 4.5 years (based on usage and size)

ROI Period

₹2–5 crore over 25 years for mid-to-large industries

Lifetime Savings

Full system, BOS & approvals included

Why Choose Us for Your Industrial Solar System in Bangalore

Choosing the right partner for your industrial solar energy system isn’t just about price — it’s about trust, performance, and long-term support. Here’s why industries across Bangalore rely on Eka Synergy Projects for their solar needs:

Proven Experience in Industrial Solar

We’ve successfully installed multiple solar PV systems for industrial use in Bangalore, including in factories, processing units, and warehouses — each engineered for unique load and roof conditions.

Engineered for Performance

Every industrial solar system we deliver is designed based on actual load profiles, operational hours, and site constraints — ensuring optimal generation and safety

Quality Components & Safety Standards

 We use Tier-1 solar panels, trusted inverters, and BOS components, installed with earthing, surge protection, cable trays, and load-bearing mounts as per industrial safety standards.

On-Time Execution with Zero Disruption

We plan around your production schedule and complete installations within committed timelines — minimizing disruption to your operations.

Transparent Proposals, No Hidden Costs

You get a clear breakdown of system size, expected savings, materials, warranty, and net feed-in scope — helping you make informed business decisions.

Ongoing Monitoring & Support

Post-installation, we help you track performance through mobile apps and provide assistance for service coordination and maintenance if needed.

why choose eka synergy solar system

FAQs – Industrial Solar System in Bangalore

1. How much does an industrial solar system cost in Bangalore?

The average cost of an industrial solar system in Bangalore ranges from ₹48,000 to ₹60,000 per kW. The final price depends on factors like rooftop structure, system size, component brands, and installation complexity.

2. What is the ROI for industrial solar power systems?

Most factories and plants recover their solar investment within 3 to 4.5 years. After that, solar delivers 15–20+ years of nearly free power, making it a high-ROI upgrade for energy-intensive industries.

3. Can factories in Bangalore export solar power to the grid?

Yes. Under BESCOM’s net feed-in policy, industries can export unused solar power to the grid and receive credits or compensation. We handle full documentation and coordination for this process.

4. Is subsidy available for industrial solar energy systems?

No, there is no government subsidy currently available for commercial or industrial solar projects. Subsidies under the PM Surya Ghar scheme apply only to residential systems.

5. Do I need batteries for my factory’s solar system?

Not always. Most industries benefit from on-grid solar systems that work alongside BESCOM power. Batteries are optional and only needed if you want backup for critical loads during outages.

6. How long does it take to install an industrial solar system?

Installation typically takes 3 to 6 weeks from approval to commissioning, depending on system size, structure readiness, and weather. We ensure minimal disruption to your operations.

7. Can solar panels run heavy industrial machines?

Yes. A properly sized industrial solar PV system can power heavy machinery, motors, and production lines — especially during peak sunlight hours. We match the system design to your load curve.

8. Is solar suitable for manufacturing units in Bangalore?

Absolutely. Many manufacturing units in Bangalore use solar to reduce grid dependency and offset rising electricity costs. We customize systems for metal sheds, RCC roofs, or open land.

9. Will solar affect my existing EB or HT connection?

No. Your HT or LT connection remains active. Solar works in parallel and reduces grid draw. BESCOM-approved net feed-in allows for legal export of excess solar power.

10.Do I need any permission for installing industrial solar panels?

Yes. You’ll need net feed-in approvals from BESCOM, structural clearance (if required), and internal safety compliance. We handle the entire documentation and approval process for you.